Ski lifts of BELLAMONTE and moena
discover all the LIFTS open in summer
In Bellamonte, the modern Bellamonte 3.0 cableway starts from the parking in Castelir locality (1550 m asl) to take you to the Giro d'Ali and Frainus family parks in le Fassane (1800 m asl) and then continues to la Morea (1970 m asl) where you will find the departure of all the paths and the horse carriage that can transport you to Malga Bocche.
In Moena, two silent 8-seater cable cars take you from the parking in Ronchi locality (1370 m asl) to the Chalet Valbona in the homonymous place (1820 m asl) and then to the spectacular panoramic point in le Cune locality (2200 m asl).
Bellamonte
Lifts opening From 14th June to 14th September 2025
Number |
State |
Type |
Lift |
Times |
44 |
|
Castelir - Le Fassane |
9.00 - 12.45 | 14.00 - 17.15 |
|
45 |
|
Le Fassane - La Morea |
9.00 - 12.45 | 14.00 - 17.15 |
|
Moena
Lifts opening From 21th June to 21th September 2025
Number |
State |
Type |
Lift |
Times |
201 |
|
Ronchi - Valbona |
8.30 - 17.15OPENING FROM 21.06.2025 |
|
202 |
|
Valbona - Le Cune |
8.30 - 12.45 | 14.00 - 17.15OPENING FROM 21.06.2025 |
|